Enron email

Algorithmic Indexing

113 messages for with:cara.semperger@enron.com after:2001-07 before:2001-08

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

with:cara.semperger@enron.com means Cara Semperger (cara.semperger@enron.com).

  1. 25 Jul 2001

    Will Smith to Cara Semperger, Corry Bentley and 4 more

    Pre-Schedule WS and Path Confirmation

    Corry, Cara, There are new versions have been released to stage. What's new and what's fixed: Pre-Schedule Workspace: Now able to select a Trading Region/Desk (EAST or WE…

  2. 25 Jul 2001

    Diana Scholtes to Cara Semperger

    FW: Length @ MID C for the 25th HE 23 & 24 FOR 50 MW

    -----Original Message----- From: Runswick, Stacy Sent: Tuesday, July 24, 2001 3:55 PM To: DL-Portland Real Time Shift Cc: Robinson, Donald; Crandall, Sean; Scholtes, Dian…

  3. 24 Jul 2001

    Rhonda L. Denton to Tim Belden, Christian Yoder, Dana Davis and 180 more

    Conoco Gas and Power Marketing, a division of Conoco Inc.

    We have received the executed EEI Master Power Purchase and Sale Agreement dated 7/19/2001 from the referenced CP. Copies will be given to legal and credit.

  4. 24 Jul 2001

    Vishwanatha Venkataswami to Will Smith and 6 more

    New Version of PathConfirm

    Will, I moved the new version of PathConfirm.Exe into P:\PowerSys\Stage, Please migrate this version into stage. In new version of Path Confirmation following items are f…

  5. 24 Jul 2001

    Frank Billington to Cara Semperger

    RE: OATI Etag 1.7 Training

    Cara, Portland will be Tuesday Sept 18 (with hospitality suite evening of Sept 17), barring major unforeseen circumstances with the venue. When it is contractually locked…

  6. 24 Jul 2001

    Corry Bentley to Cara Semperger

    RE: More name changes for the short Enpower Names

    We're OK with CPS (Constellation) also. If you agree to the list I'll go ahead and submit them. Thanks, Corry

  7. 23 Jul 2001
  8. 23 Jul 2001

    Bill Williams III to Cara Semperger

    Position manager

    Cara, We are short 14 mws at the Portland General System in position manager for Friday, July 20th. HE 5 and HE 6. Pacificorp deal #694155 is not in for those hours. Coul…

  9. 23 Jul 2001

    David Poston to Cara Semperger and 2 more

    FW: User Testing - Stage - Build Route

    Good Morning Cara, The changes you requested for the Buildroute report have been migrated to stage. You can either test it in either of the test environments (pwrtestn or…

  10. 23 Jul 2001

    Cara Semperger to Holden Salisbury

    New Sheet

    Let's try like hell to get together today.

  11. 23 Jul 2001

    Cara Semperger to Bill Williams III

    RE: Position manager

    I fixed it, no idea where those megawiggles went

  12. 23 Jul 2001

    Corry Bentley to Cara Semperger and 2 more

    RE: Testing June 22

    Cara, I was out Friday, but totally agree on segregation of East and West Confirmations. Also, I agree that there needs to be a method to delete confirmation records (eit…

  13. 20 Jul 2001

    Stacy Runswick to shift.portland@enron.com and 8 more

    Length at PV heavy for the 20th

    We are 25 mws long HE 7-22 at palo verde in the real-time position manager. I printed a forward obligation report for the 20th and that report does not reflect this lengt…

  14. 20 Jul 2001

    Cara Semperger to Bill Williams III and 4 more

    We need to put our brains together for some communication stuff

    Because Lotus will probably go away when the new Enpower system comes online, and Mike brought up a good point about not being able to mine information from the current e…

  15. 19 Jul 2001

    Donald Robinson to shift.portland@enron.com and 2 more

    Preschedule path going Real-Time for Friday, 07/20/01.

    7/20, HLH, 19MW: BPA C#23634-EPMI-MORGAN-PINW-CPS-PPLM-SNOH(T)BPAP/HTSP #96092NF-PPLM PPLM failed to buy the transmission for Friday. This path will go real-time. Our rea…

  16. 19 Jul 2001

    Asem Atta to Cara Semperger

    RE: Preparing for Next Test Day

    Cara, Following issues are handled in this version.. Slowness - Overall optimization of handling all routines dealing with data extraction within sheets. "Variant Convers…

  17. 19 Jul 2001

    Asem Atta to Cara Semperger, Corry Bentley and 4 more

    RE: Preparing for Next Test Day

    New version of PreSchedWS has been migrated to Stage.. Corry - TVA routing records have been deleted for 6/22/01 Cara - All specified delivery points records have been de…

  18. 19 Jul 2001

    Jill Chatterton to Cara Semperger, Bill Williams III, David Poston and 2 more

    Out of Office

    I have an appointment today and will need to leave the office around 3pm.. I will be back in the office on Friday. If you need anything before 3pm let me know, otherwise …

  19. 18 Jul 2001

    Rhonda L. Denton to Tim Belden, Christian Yoder, Dana Davis and 182 more

    Xcel Energy Inc. to Northern States Power Company

    On Aug. 18, 2000, New Century Energies, Inc. and Northern States Power Company (NSP) merged and formed Xcel Energy Inc. As part of the merger, NSP transferred its existin…

  20. 18 Jul 2001

    Cara Semperger to Virginia Thompson and 2 more

    Real Time Length dispute answer

    This was the schedule that Real time forgot to sell off real time. Please see Bill Williams for more details. c

  21. 18 Jul 2001

    Corry Bentley to Cara Semperger, Will Smith

    RE: Continued Testing-June 21 target Date

    Cara, I pulled several comments you made out, and dittos from here. I agree with your following statements: Even though this path could be consolidated to be smaller, we …

  22. 18 Jul 2001

    Tim Belden to Tom Alonso, Robert Badeer, Tim Belden and 16 more

    ACTION REQUIRED: Attend Staff Meeting Friday, July 20

    Please make plans to attend a West Power Trading luncheon staff meeting. Chris Stokley and Jeff Richter, please feel free to attend if you are in Portland. Date: Friday, …

  23. 18 Jul 2001

    Corry Bentley to Cara Semperger

    RE: Transmission Stuff in the new system

    Regardless of your "misc mind altering" habits, I think Will did say that they would only be able to have path modifications/cuts modified in the notes part initially. Th…

  24. 18 Jul 2001

    Cara Semperger to Corry Bentley, David Poston, Will Smith and 1 more

    RE: Preschedule Workspace Testing-June 21 target date

    Good Morning All, I will talk to Corry about how we need our transmission represented. The format is ok, I just need more information in the path or the ability to put th…

  25. 18 Jul 2001

    Will Smith to Cara Semperger and 6 more

    RE: Preschedule Workspace Testing-June 21 target date

    Cara, PreSchedule: 1. Concerning the path with transmission data... The original format was based off of Corry's suggestion. Perhaps the two of you need to discuss your n…