Enron email

Algorithmic Indexing

135 messages for from:a..howard@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:a..howard@enron.com means Kevin A. Howard (a..howard@enron.com).

  1. 13 Feb 2002

    Kevin A. Howard to Shelley Corman

    RE: NAG 10 year valuation model

    We will address tomorrow with stan -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.net)

  2. 12 Feb 2002
  3. 12 Feb 2002

    Kevin A. Howard to Bob Chandler, Rod Hayslett, Tracy Geaccone and 8 more

    RE: NNG 10 year valuation model

    Tax gave us the same feedback. Davis had not yet updated the model for this. Thanks. -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.…

  4. 12 Feb 2002

    Kevin A. Howard to Rod Hayslett, Tracy Geaccone, Bob Chandler and 4 more

    NNG 10 year valuation model

    I met with Jayshree Desai this morning to discuss the recommended changes to the NNG valuation model. She will make these and circulate the model later today. I few items…

  5. 11 Feb 2002

    Kevin A. Howard to Kevin Hyatt

    RE: TW Credit Rating

    i made some slight modifications.

  6. 11 Feb 2002
  7. 11 Feb 2002
  8. 11 Feb 2002

    Kevin A. Howard to Kevin Hyatt

    RE: Updated: Meet w/ Jim Adams (Panda) & Bob Adrian (TECO)

    Anytime after 4 on Tuesday or anytime Wed. morning.

  9. 8 Feb 2002

    Kevin A. Howard to Kevin Hyatt

    Re: Updated: Meet w/ Jim Adams (Panda) & Bob Adrian (TECO)

    Kevin I have a meeting on tues from 1-4 with stan. Is this the only time available? -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.n…

  10. 8 Feb 2002

    Kevin A. Howard to Shelley Corman

    FW: Northern IM

    I think my exact words were THE best, not "one of the best"!

  11. 8 Feb 2002

    Kevin A. Howard to Davis Thames, Rod Hayslett, James Centilli and 4 more

    RE: tw model

    I would bring 10 copies of the valuation page, assumptions page, financial statements (annual), expansion pages, revenue back up. Anything else?

  12. 7 Feb 2002

    Kevin A. Howard to Rod Hayslett, James Centilli, Davis Thames and 3 more

    RE: tw subscription rolloff template

    We are looking for the cost estimates for each of the expansions we discussed yesterday (except Red Rock and TransPecos)

  13. 7 Feb 2002

    Kevin A. Howard to James Centilli, Rod Hayslett, Davis Thames and 3 more

    RE: tw subscription rolloff template

    we need a guess now. Stan wants a first pass by tomorrow afternoon - we should be able to ballpark this number.

  14. 7 Feb 2002

    Kevin A. Howard to Rod Hayslett, Davis Thames, Tracy Geaccone and 3 more

    RE: tw subscription rolloff template

    James: Can you roll each of the expansions that we discussed into Rod's project model? Michael Ratner will then link those into the TW financial model. Kevin

  15. 7 Feb 2002

    Kevin A. Howard to Davis Thames, Tracy Geaccone, Michael Ratner and 4 more

    RE: tw subscription rolloff template

    Attached is the actual contract roll off info by segment prepared by Shelley Corman for our bank due diligence. We need to use this and assume we re-subscribe the roll of…

  16. 5 Feb 2002

    Kevin A. Howard to Kevin Hyatt

    Re: SD model

    Why aren't we using the lower capex number with the lower rates? -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry.net)

  17. 4 Feb 2002

    Kevin A. Howard to James Centilli and 2 more

    RE: REvised TransPecos Model

    much better - even I can follow this one! thanks. this will allow them to get up to speed much quicker. Kevin

  18. 1 Feb 2002

    Kevin A. Howard to Kimberly Watson

    PGE and Virtual Capacity

    Kim: Do you have any write ups on the above projects that were discussed this afternoon?

  19. 1 Feb 2002

    Kevin A. Howard to Eric Gadd, Kevin Hyatt

    Sun Devil

    Can we schedule 1-2 hours early next week to go over Sun Devil, including economics and assumptions? In addition, I want to discuss the financial model that we need for A…

  20. 1 Feb 2002

    Kevin A. Howard to James Centilli and 2 more

    RE: TransPecos Model

    James: Can we scale this down a bit? As I mentioned to Kevin Hyatt yesterday, we just need a slimmed down version for them to get started with. If this is not possible, w…

  21. 31 Jan 2002

    Kevin A. Howard to Kimberly Watson

    RE: office space

    Response number 2 - it would be for myself, Davis and my assistant Terri Bachand.

  22. 31 Jan 2002

    Kevin A. Howard to Kevin Hyatt

    RE: Sun Devil

    kevin: Unfortunately, this is too far in the other direction! The earnings page has no formulas at all. Maybe we should go back to the bigger model if you think it is one…

  23. 31 Jan 2002

    Kevin A. Howard to Kevin Hyatt

    Re: Sun Devil

    Thanks. Let's start with this and add more later. We need to bring them along slowly. -------------------------- Sent from my BlackBerry Wireless Handheld (www.BlackBerry…

  24. 31 Jan 2002

    Kevin A. Howard to Kimberly Watson

    Re: office space

    Kim I appreciate you moving so quickly on this. However, before we do anything, I need to see what you are proposing and visit with rod. Thanks. -------------------------…

  25. 31 Jan 2002

    Kevin A. Howard to Kevin Hyatt

    RE: TW project information

    can we summarize it into a smaller, more manageable format? They probabaly don't need this much detail to get started. I would suggest just summarizing.