to:joann.collins@enron.com means Joann Collins (joann.collins@enron.com).
-
31 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/31, 4/1 thru 4/3
The attached file contains our daily volume requirements for 3/31 thru 4/3 . There are two worksheets: The one labelled with today's date contains the volumes that we nee…
-
30 Mar 2000
Joan Veselack to Victor Lamadrid, Robin Barbe, Dick Jenkins and 9 more
Re: Cogens for 4/00 - MAXIMUM DISPATCH
To ensure everyone is on the same page for maximum dispatch. 80,000 for Hopewell Dispatch: 10,000 nom'd on Secondary FTS TCO contract. Secondary nominated to reserve plac…
-
30 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/30 and after
The attached file contains our daily citygate volume requirements for 3/30 and 3/31 . There are two worksheets: The one labelled with today's date contains the volumes th…
-
30 Mar 2000
Steve Gillespie to Chris Germany, Dan Junek, Scott Goodell and 6 more
Dayton SST Contract for Summer Season, 4/1 to 10/31
Chris, Operational note on DPL Columbia Gas SST contract for April: The total contract volume will decrease from 241,000 to 120,000 on April 1st. By the terms of the deal…
-
29 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/29 and after
The attached file contains our daily volume requirements for 3/29 and 3/30 . There are two worksheets: The one labelled with today's date contains the volumes that we nee…
-
28 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/28 and after update
The attached file is an update to the file of the same name that I sent earlier this morning. The only change is a reduction in daily Dth off Transco Z5 into Piedmont fro…
-
28 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/28 and after
The attached file contains our daily volume requirements for and . There are two worksheets: The one labelled with today's date contains the volumes that we need at each …
-
27 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 26 more
CES Daily March Requirements for 3/27 and 3/28
Chris--The attached file contains the daily changes for 3/27 and 3/28 in the volumes of gas that we need by market area. The daily changes are relative to what we request…
-
27 Mar 2000
Victor Lamadrid to Joan Veselack and 10 more
Re: April 1st Position
For APRIL 1, The Choice sale to CES is deal #227081. The Baseload RETAIL sale to CES deal # is 227113. I created new tickets because the ones we are using are HUGE!!!! an…
-
24 Mar 2000
Chris Germany to Robert Allwein, Joann Collins and 4 more
Re: Columbia Gas of Ohio on CGAS for Jan 00
Since we now feel certain ENA bought this gas on Jan 21st, please path the supply deal from COH (deal 153863) to one of those large CES deal tickets. I'm still checking t…
-
24 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 24 more
CES Daily March Requirements for 3/24 and after
Please see attached. We'll be calling in a few minutes to notify of daily swings and to negotiate prices. Doug Kinney Ph: 703-561-6339 Fax: 703-561-7317 - 03-24-00 CES Da…
-
23 Mar 2000
Chris Germany to Robert Allwein and 12 more
Sale to Allegheny
I entered the sale to Allegheny in Sitara (deal 224977) effective 4/1/200 thru 10/31/2000. Dick, Scott, the sales price is trigger deal priced at NX1 + $.22. Allegheny ho…
-
23 Mar 2000
Joan Veselack to jwhited@columbiaenergygroup.com, hboyd@columbiaenergygroup.com and 12 more
Allied Signal Buyback - 90,000
John, per voicemail. Reduced deliveries to Allied Plant by 90,000 or 15,000/day, effective 3/24 to 3/29. 39095/124 was = 12809/12426/12163 now = 0 (super nom from mainlin…
-
23 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/23 and after
Chris--Attached is an updated daily requirements file with lower deliveries for 3/23, 3/24 and 3/25 into DP&L off Texas Gas. The reduction for 3/23 is 160 dth below the v…
-
23 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/23 and after
Attached are CES's latest volume reqs. for March 23 and beyond. Doug Kinney Ph: 703-561-6339 Fax: 703-561-7317 - 03-23-00 daily volsAM.xls
-
22 Mar 2000
Joan Veselack to jwhited@columbiaenergygroup.com, Chris Germany, Scott Goodell and 16 more
Allied Signal
Per my voicemail message to John. I talked to Stacy Miller at TCO to better understand the SIT limitations. TCO has something called TFE (Total Firm ???). Plants can burn…
-
22 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/22 and after
Please find attached the CES daily volume requirements for 3/22 and beyond for March. Doug Kinney Ph: 703-561-6339 Fax: 703-561-7317 - 03-22-00 daily volsAM.xls
-
21 Mar 2000
Joan Veselack to jwhited@columbiaenergygroup.com, kdestep@columbiaenergygroup.com and 14 more
Re: CES/Aristech deal
This deal is starting to get confusing.... so here is the whole deal effective 3/21 to 3/31. gulf / leach/coh 22-3 38011/46 8979/8711/8527 51875/25 3657/3548/3473 60599/7…
-
21 Mar 2000
Chris Germany to Joan Veselack, Katherine L Kelly, jesse.villarreal@enron.com and 5 more
CES/Aristech deal
I sold CES 2727dt of CGLF mainline gas (deal 221731) effective 21st-31st. Aristech only had enough mainline capacity to pull away 751 dt. I changed the volume on this dea…
-
21 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, Chris Germany and 22 more
CES Daily March Requirements for 3/21 and after
Here are CES's daily volume requirements. Doug Kinney Ph: 703-561-6339 Fax: 703-561-7317 - 03-21-00 daily volsAM.xls
-
20 Mar 2000
John M Singer to Colleen Sullivan and 12 more
Re: Citygate Production GAS behind TCO - PLEASE READ
Actually, the deal is for 773/day @ into CPA via the Carnegie-Jefferson interconnect. The price is NX1 + $0.12/Dth; the contract expires 11/01/00. This gas only flowed fo…
-
20 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, cgerman@ect.enron.com and 22 more
CES Daily March Requirements for 3/20 and after
Chris and Kevin--The attached file contains our latest daily volume requirements for 3/20 and the rest of March. One caveat: I have included here the additional 150 dth/d…
-
20 Mar 2000
Colleen Sullivan to Chris Germany and 12 more
Re: Citygate Production GAS behind TCO - PLEASE READ
I see a deal on our list from CES-Wholesale which includes a deal with CNG Field Services with a term of 8/1/99 through 8/1/00 for a monthly volume of 12,690 MMBtu, at CP…
-
17 Mar 2000
dkinney@columbiaenergygroup.com to Kevin Ruscitti, cgerman@ect.enron.com and 22 more
CES Daily March Requirements for 3/17 and after
The attached file contains the latest daily volume requirements for CES for March. Doug Kinney Ph: 703-561-6339 Fax: 703-561-7317 - 03-17-00 daily volsAM.xls
-
16 Mar 2000
Joan Veselack to Robert Allwein, Joann Collins and 14 more
Re: Choice Storage Withdrawal - March 2000 - UPDATE
We have reached the last ratchet at 67,371. In yesterday's meeting with TCO pipeline, it was confirmed that we should call gas control direct 304-357-2606, when we true-u…