to:rich.jolly@enron.com means Rich Jolly (rich.jolly@enron.com).
-
30 Aug 2000
Michel Nelson to Larry Campbell and 12 more
Re: Compliance with the Large Quantity Generator Requirements, Transwestern Pipeline Company
Environmental needs to make any calls /decisions on this. Any Capital /O&M requirements will have to be put into 2002 Plan at this stage.
-
22 Aug 2000
Lisa Costello to jerome.hickl@enron.com, kenneth.l.kimbro@enron.com, gary.carroll@enron.com and 301 more
Memo to GPG Management -- Leadership Development
Please see the attached memo from Roger Sumlin.
-
17 Aug 2000
John Shafer to Michel Nelson, Dave Odneal, Louis Soldano and 9 more
Agreement with Rod Boschee (PG&E)
Following our conference call this morning and the consensus we reached, I placed a call to Rod Boschee and we discussed the following items. One of the key points Rod ma…
-
17 Aug 2000
John Shafer to Michel Nelson, Dave Odneal, Louis Soldano and 9 more
Proposed Topock Separator - September 11/12
I will be holding a conference call today at 11:00 AM (Central time) for the purpose of relating some information I have received from Rod Boshcee of PG&E. The conference…
-
11 Aug 2000
Larry Campbell to Louis Soldano, John Shafer and 14 more
PCB Study on the SoCal System
I received a call from Ralph Komai, PCB engineer with SoCal, about a pipeline liquids collection SoCal wants to take at our Needles facility. Ralph said that SoCal will b…
-
7 Aug 2000
John Shafer to Michel Nelson, Phil Lowry and 8 more
Saturday's LA Times on a new twist in the California power shorta ge story
Gentlemen, Take a look at what is going on in California (this may or may not relate to how badly PG&E needs natural gas). John
-
1 Aug 2000
Larry Campbell to Rick Cates, Rich Jolly, William Kendrick and 4 more
Testing at Station 3
When we do the emissions testing at C/S No. 3, Luepp, we should be aware of the positives and negatives. The positives being the information which Steve and company will …
-
28 Jul 2000
Drew Fossum to Bob Burleson and 8 more
Re: FW: QUESTIONS AND REQUEST FOR INFORMATION
The tie in line that TW built is not part of the deal. We are modifying the agreements to make that totally clear and I believe Rockey is going to talk to Mary Ann Pearce…
-
15 Jul 2000
John Shafer to Louis Soldano and 16 more
Meeting Notes - July 13, 2000 with PG&E
Attached for your reference is a copy of the meeting notes taken on July 13, 2000 during a meeting with PG&E at TW's Flagstaff Compressor Station. One of the critical iss…
-
14 Jul 2000
George Robinson to Louis Soldano and 8 more
NNG Gomez Site - Potential Sale Issues
Lou- Here are some suggestions: 1. Exclude the remediation system equipment: 350 bbl AST and equipment building with air compressor. 2. We will need unrestricted access 2…
-
5 Jul 2000
Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 10 more
Latest deconning Activity-Topock Lateral
As a result of the latest meeting with PG&E over the greater than 500 ppm PCB liquids collection at the PGE Topock C/S filter separator (F/S), presented below is a summar…
-
22 Jun 2000
Jan Cobden to Michel Nelson, Steven Harris, David Roensch and 6 more
PG&E Meeting Notes
This is being forwarded for your review in preparation for the 2:00 p.m. conference call, and just FYI for those not participating in the conference call.
-
12 Jun 2000
Larry Campbell to Michel Nelson, John Shafer, Rich Jolly and 11 more
Additonal PCB Sampling on the SoCal System
During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB pers…
-
2 Jun 2000
David Roensch to bcross@hciww.com, Michael Adewumi and 4 more
Section 4 Main line Pigs
Attached for your review, please note the photos of the pigs received on the mainline in section 4. These are pigs Coastal oversized per piping specs. Approximately 10 ga…
-
1 Jun 2000
Larry Campbell to Gallup-Sta4, Team, Team Gallup and 6 more
Title V Permit for C/S No. 4, Klagetoh
The Title V air permit for C/S No. 4 has been issued. There are some requirements and conditions under this permit that the team should be aware of and will be required t…
-
19 May 2000
Susan Scott to mikemc@swps.com and 4 more
WT-1 Service Contract amendment
Mike, please see the attached. The first document has Transwestern's revisions highlighted. If this meets with your approval, please execute two originals and send them t…
-
15 May 2000
Larry Campbell to Michel Nelson, Rich Jolly, Earl Chanley and 5 more
May PCB Meeting Notes ET&S and PG&E
1. Status of Mainline Filter Separator Project. Earl Chanley has indicated that the June 1 target date for in service is on schedule. There will be 2 mainline separators …
-
15 May 2000
Re: Sign Off
will do.... Rich Jolly on 05/15/2000 10:25:38 AM To: Larry Campbell/ET&S/Enron@Enron cc: Team San-Juan/ET&S/Enron@Enron, Butch Russell/ET&S/Enron@Enron, Rick Smith/ET&S/E…
-
10 May 2000
Susan Scott to Rich Jolly and 2 more
Re: WT-1 Electric Service Agreement
Rich - Dave and I were just discussing whether a period less than 12 months would be appropriate (see language below), given that dereg. may bring some changes we want to…
-
10 May 2000
Susan Scott to David Foti and 2 more
Re: WT-1 Electric Service Agreement
What if we replace Section 2 with something like "This Agreement shall continue in effect unless and until terminated pursuant to Section 3," and replace Section 3 with "…
-
10 May 2000
Susan Scott to David Foti and 2 more
WT-1 Electric Service Agreement
P.S. -- Dave, on your wish list you had included an evergreen provision. See Section 2 of the original contract, which gives TW the right to extend for another five-year …
-
10 May 2000
Susan Scott to Rich Jolly, David Foti
WT-1 Electric Service Agreement
Rich and Dave, attached are my suggested revisions to Mike McLeod's draft of an amendment to the original electric service agreement. Dave, I'll bring you a copy of that …
-
8 May 2000
Michel Nelson to Rich Jolly, Larry Campbell, Earl Chanley and 6 more
RE: Operational Issues - Memo Attached
Rich / Larry / Earl: I sent a letter to Mike Katz, copy to Rod Boschee, that formally restated what I had requested at our last meeting in San Francisco. They responded w…
-
5 May 2000
Larry Campbell to George Robinson, Team Laguna and 4 more
Re: Sta. 6 UST Excavation
George/Norm because there is no immediate concern or liability with the partially filled excavation, I want us wait for the official letter from the tribe before taking i…
-
3 May 2000
Larry Campbell to Team San-Juan-LaPlata and 6 more
Emission Factors for Permit No. 97LP0653
Larry, as per our conversation, presented below are the emissions factors provided by the state of Colorado for the T-7000 Centaur under permit 97LP0653 : PM10 14.000/MMS…