  1. 30 Aug 2000

    Michel Nelson to Larry Campbell and 12 more

    Re: Compliance with the Large Quantity Generator Requirements, Transwestern Pipeline Company

    Environmental needs to make any calls /decisions on this. Any Capital /O&M requirements will have to be put into 2002 Plan at this stage.

  2. 22 Aug 2000
  3. 17 Aug 2000

    John Shafer to Michel Nelson, Dave Odneal, Louis Soldano and 9 more

    Agreement with Rod Boschee (PG&E)

    Following our conference call this morning and the consensus we reached, I placed a call to Rod Boschee and we discussed the following items. One of the key points Rod ma…

  4. 17 Aug 2000

    John Shafer to Michel Nelson, Dave Odneal, Louis Soldano and 9 more

    Proposed Topock Separator - September 11/12

    I will be holding a conference call today at 11:00 AM (Central time) for the purpose of relating some information I have received from Rod Boshcee of PG&E. The conference…

  5. 11 Aug 2000

    Larry Campbell to Louis Soldano, John Shafer and 14 more

    PCB Study on the SoCal System

    I received a call from Ralph Komai, PCB engineer with SoCal, about a pipeline liquids collection SoCal wants to take at our Needles facility. Ralph said that SoCal will b…

  6. 7 Aug 2000

    John Shafer to Michel Nelson, Phil Lowry and 8 more

    Saturday's LA Times on a new twist in the California power shorta ge story

    Gentlemen, Take a look at what is going on in California (this may or may not relate to how badly PG&E needs natural gas). John

  7. 1 Aug 2000

    Larry Campbell to Rick Cates, Rich Jolly, William Kendrick and 4 more

    Testing at Station 3

    When we do the emissions testing at C/S No. 3, Luepp, we should be aware of the positives and negatives. The positives being the information which Steve and company will …

  8. 28 Jul 2000

    Drew Fossum to Bob Burleson and 8 more

    Re: FW: QUESTIONS AND REQUEST FOR INFORMATION

    The tie in line that TW built is not part of the deal. We are modifying the agreements to make that totally clear and I believe Rockey is going to talk to Mary Ann Pearce…

  9. 15 Jul 2000

    John Shafer to Louis Soldano and 16 more

    Meeting Notes - July 13, 2000 with PG&E

    Attached for your reference is a copy of the meeting notes taken on July 13, 2000 during a meeting with PG&E at TW's Flagstaff Compressor Station. One of the critical iss…

  10. 14 Jul 2000

    George Robinson to Louis Soldano and 8 more

    NNG Gomez Site - Potential Sale Issues

    Lou- Here are some suggestions: 1. Exclude the remediation system equipment: 350 bbl AST and equipment building with air compressor. 2. We will need unrestricted access 2…

  11. 5 Jul 2000

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 10 more

    Latest deconning Activity-Topock Lateral

    As a result of the latest meeting with PG&E over the greater than 500 ppm PCB liquids collection at the PGE Topock C/S filter separator (F/S), presented below is a summar…

  12. 22 Jun 2000

    Jan Cobden to Michel Nelson, Steven Harris, David Roensch and 6 more

    PG&E Meeting Notes

    This is being forwarded for your review in preparation for the 2:00 p.m. conference call, and just FYI for those not participating in the conference call.

  13. 12 Jun 2000

    Larry Campbell to Michel Nelson, John Shafer, Rich Jolly and 11 more

    Additonal PCB Sampling on the SoCal System

    During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB pers…

  14. 2 Jun 2000

    David Roensch to bcross@hciww.com, Michael Adewumi and 4 more

    Section 4 Main line Pigs

    Attached for your review, please note the photos of the pigs received on the mainline in section 4. These are pigs Coastal oversized per piping specs. Approximately 10 ga…

  15. 1 Jun 2000

    Larry Campbell to Gallup-Sta4, Team, Team Gallup and 6 more

    Title V Permit for C/S No. 4, Klagetoh

    The Title V air permit for C/S No. 4 has been issued. There are some requirements and conditions under this permit that the team should be aware of and will be required t…

  16. 19 May 2000

    Susan Scott to mikemc@swps.com and 4 more

    WT-1 Service Contract amendment

    Mike, please see the attached. The first document has Transwestern's revisions highlighted. If this meets with your approval, please execute two originals and send them t…

  17. 15 May 2000

    Larry Campbell to Michel Nelson, Rich Jolly, Earl Chanley and 5 more

    May PCB Meeting Notes ET&S and PG&E

    1. Status of Mainline Filter Separator Project. Earl Chanley has indicated that the June 1 target date for in service is on schedule. There will be 2 mainline separators …

  18. 15 May 2000

    Larry Campbell to Rich Jolly

    Re: Sign Off

    will do.... Rich Jolly on 05/15/2000 10:25:38 AM To: Larry Campbell/ET&S/Enron@Enron cc: Team San-Juan/ET&S/Enron@Enron, Butch Russell/ET&S/Enron@Enron, Rick Smith/ET&S/E…

  19. 10 May 2000

    Susan Scott to Rich Jolly and 2 more

    Re: WT-1 Electric Service Agreement

    Rich - Dave and I were just discussing whether a period less than 12 months would be appropriate (see language below), given that dereg. may bring some changes we want to…

  20. 10 May 2000

    Susan Scott to David Foti and 2 more

    Re: WT-1 Electric Service Agreement

    What if we replace Section 2 with something like "This Agreement shall continue in effect unless and until terminated pursuant to Section 3," and replace Section 3 with "…

  21. 10 May 2000

    Susan Scott to David Foti and 2 more

    WT-1 Electric Service Agreement

    P.S. -- Dave, on your wish list you had included an evergreen provision. See Section 2 of the original contract, which gives TW the right to extend for another five-year …

  22. 10 May 2000

    Susan Scott to Rich Jolly, David Foti

    WT-1 Electric Service Agreement

    Rich and Dave, attached are my suggested revisions to Mike McLeod's draft of an amendment to the original electric service agreement. Dave, I'll bring you a copy of that …

  23. 8 May 2000

    Michel Nelson to Rich Jolly, Larry Campbell, Earl Chanley and 6 more

    RE: Operational Issues - Memo Attached

    Rich / Larry / Earl: I sent a letter to Mike Katz, copy to Rod Boschee, that formally restated what I had requested at our last meeting in San Francisco. They responded w…

  24. 5 May 2000

    Larry Campbell to George Robinson, Team Laguna and 4 more

    Re: Sta. 6 UST Excavation

    George/Norm because there is no immediate concern or liability with the partially filled excavation, I want us wait for the official letter from the tribe before taking i…

  25. 3 May 2000

    Larry Campbell to Team San-Juan-LaPlata and 6 more

    Emission Factors for Permit No. 97LP0653

    Larry, as per our conversation, presented below are the emissions factors provided by the state of Colorado for the T-7000 Centaur under permit 97LP0653 : PM10 14.000/MMS…