  1. 10 Oct 2001

    Kevin M. Presto to Rika Imai

    FW: Winter Assessment

    Are all of these units in our database?

  2. 10 Oct 2001

    Kevin M. Presto to Tamara Jae Black

    FW: ENA Trading Track - Interviews October

    -----Original Message----- From: Buckley, Karen Sent: Wednesday, October 10, 2001 2:17 PM To: Allen, Phillip K.; Arnold, John; Arora, Harry; Benson, Robert; Brawner, Sand…

  3. 10 Oct 2001

    Kevin M. Presto to Billy Braddock

    RE: TEA - into MEAG

    Notice on the tags when we go hourly could be 30 minutes or less. Additionally, if we use them as sink when we go hourly, they will have to be part of the day-ahead tag. …

  4. 9 Oct 2001

    Kevin M. Presto to Lloyd Will

    RE: Transmission Maps

    We don't need gas at this point, but we should be planning to add this.

  5. 9 Oct 2001

    Kevin M. Presto to Billy Braddock

    RE: TEA - into MEAG

    We need the hourly option to allow for non-GTC sources, but we will deliver into-GTC border hourly.

  6. 9 Oct 2001
  7. 9 Oct 2001

    Kevin M. Presto to Lloyd Will

    Transmission Maps

    I would like ASAP (by new building) a huge wall map with the logical RTO boundaries that has all of the large generators and substations (nodes in LMP) and LSE's territor…

  8. 9 Oct 2001

    Kevin M. Presto to William S. Bradford

    RE: PG&E Energy Trading - Power, L.P.

    I did not realize we were going to reserve on spreads which create zero net position and almost zero credit risk. The new forward correlations are 90+% per the var model …

  9. 9 Oct 2001

    Kevin M. Presto to Lloyd Will

    RE:

    He is a definite hire. I thought I communicated that last week.

  10. 8 Oct 2001
  11. 8 Oct 2001

    Kevin M. Presto to Billy Braddock

    RE: TEA - into MEAG

    Will he let us go hourly at least 5 times per month and change the source if we go hourly. This essentially would require they provide parking and lending for up 20 MW in…

  12. 8 Oct 2001

    Kevin M. Presto to Edward Sacks, Trey Hardy, Casey Evans and 15 more

    RE: PG&E Energy Trading - Power, L.P.

    There should be no credit on a TVA/Cin spread. The correlation between the 2 markets is 95% plus.

  13. 8 Oct 2001

    Kevin M. Presto to Billy Braddock

    RE: TEA - into MEAG

    Ask him if Scherer 1,2,3 and/or 4 would work? Let him know that an odd lot would command a $2.50-3.00/Mwh premium on top In addition, even if we used Scherer, it would be…

  14. 8 Oct 2001
  15. 8 Oct 2001
  16. 8 Oct 2001

    Kevin M. Presto to John Suarez

    RE: Ravi Thuraisingham

    Let's sit down and talk. I think we should fill from within our current desk. I have some ideas.

  17. 7 Oct 2001

    Kevin M. Presto to Casey Evans, Stacey W. White

    Position Report Format

    Please make the following revisions to the peak and off-peak position reports: Remove ERCOT wind position completely from the report (PPA has been terminated) Add ERCOT n…

  18. 6 Oct 2001

    Kevin M. Presto to Tammy R. Shepperd, Tamara Jae Black, Lloyd Will and 1 more

    RE: Updated floor plans

    TJ, Please provide me with the latest hard copy so I can have one final meeting with my direct reports to get final confirmation for East Power seating. Thanks.

  19. 5 Oct 2001

    Kevin M. Presto to Heather Kroll and 2 more

    RE: Entergy cancels merchant plant in Louisiana

    Thanks for the info Heather. In terms of forward curve, Entergy is the worst place to be long assets right now. The equipment is probably of more interest as it relates t…

  20. 5 Oct 2001

    Kevin M. Presto to Frank Hayden

    RE:

    We are already completely full. In fact, we are already 2 seats short for my own group.

  21. 5 Oct 2001

    Kevin M. Presto to John Suarez

    RE: Ravi Thuraisingham

    Sounds like he might fit in the LMP/transmission/congestion management group. As I mentioned, we are attempting to create an Eastern Interconnect LMP model to model conge…

  22. 3 Oct 2001

    Kevin M. Presto to Mike Curry

    RE: Wind $7MM

    This has not been booked. I was told Q4. What is this?

  23. 3 Oct 2001

    Kevin M. Presto to David Leboe

    RE: East Power - 3Q Analyst Conference Presentation Slide

    I don't like the 2nd bullet - not positive enough. We are the dominant player in the power market. With respect to volumes for term trades, the risk group will have to pr…

  24. 3 Oct 2001

    Kevin M. Presto to mark@evans-automation.com

    Presto Residence

    As a follow-up to our meeting on Saturday, I talked with the designer of my house (Todd Rice with Rice Residential Design) and the electrical plan is not on a CAD system.…

  25. 3 Oct 2001

    Kevin M. Presto to wendy@evans-automation.com

    RE: New address

    Lakes on Eldridge subdivision: 5410 Morning Breeze Houston, TX 77041