Enron email

Algorithmic Indexing

445 messages for to:rich.jolly@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

to:rich.jolly@enron.com means Rich Jolly (rich.jolly@enron.com).

  1. 14 May 2001

    Larry Campbell to Louis Soldano, John Shafer, William Kendrick and 3 more

    RE: status, PCB pipeline modeling study

    Louie, after the presentation MIchael gave, there were some issues about the data and predictions ie., like how much solvent do we really need to clean the pipeline and t…

  2. 11 May 2001

    Larry Campbell to team.flagstaff-sta2@enron.com, Team Flagstaff, team.kingman-sta1@enron.com and 6 more

    pollution Prevention Training

    Under the regulations of the state of Arizona, facilities which have a pollution prevention plan (sta.1, sta. 2 and Needles) are required to have an annual training to ev…

  3. 11 May 2001

    Larry Campbell to Edward Attanasio and 8 more

    Re: Bakersfield Environmental Action Items

    Ed, I would appreciate it very much if you would review the action item list from Scott Jones and choose which items are Koch's responsibility and which items belong to E…

  4. 11 May 2001

    Larry Campbell to Louis Soldano, Edward Attanasio, scott.jones@enron.com and 4 more

    Bakersfield Environmental Action Items

    Louie/Ed I know you guys are busy, but because of the emphasis Enron places on ensuring that action items from consolidated audits are completed prior to the action item …

  5. 11 May 2001

    Edward Attanasio to Larry Campbell and 8 more

    Re: Bakersfield Environmental Action Items

    Sorry I have not responded sooner, but I've been tied up with the crude lines transaction. The mercury contamination by the old meter shop and hydrocarbon contamiantion a…

  6. 10 May 2001

    Ray Smith to Jerry D. Martin and 34 more

    Red Rock Weekly Report

    1. ACTIVITIES: a. Successful visit to Nuovo Pignone in Italy this week by a team consisting of representatives from E&C, GE and the engineering contractor, UEI. Most of t…

  7. 8 May 2001

    Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more

    PG&E Sample Report

    See attached for liquids gathered for this months sample run. Results will follow.

  8. 7 May 2001

    Max Brown to John Keller, Morgan Gottsponer, Kevin Hyatt and 13 more

    Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River

    As I will be out of town at Gallup NM this week for the excavations planned for TW L-154 line, I will will miss the the meeting on the 10th. I have begun preparation of a…

  9. 30 Apr 2001
  10. 27 Apr 2001

    Scott_Jones@eott.com to Larry Campbell and 14 more

    Re: Remediation/Contamination Assessments

    Lou/Ed, attached is a spreadsheet that contains environmental action items concerning the NCL FRACTIONATOR. These items are the result of the consolidated audit performed…

  11. 26 Apr 2001

    Jeffery Fawcett to Danny McCarty, Steven Harris, Kevin Hyatt and 12 more

    Enron - Kinder Morgan Hueco Pipeline Project

    Rod Hayslett and I met with Kinder Morgan on 4/25 to discuss the possible commercial structures under which Enron and Kinder could jointly develop, construct and operate …

  12. 22 Apr 2001

    Arnold Eisenstein to Jerry D. Martin and 32 more

    Red Rock Weekly Report

    1. ACTIVITIES: a. Video conference held with GE/NP to refine turbine SOW b. Marketing held a "bid" last week ending on Friday; results are encourging as multible bids wer…

  13. 19 Apr 2001

    Team Kingman-Needles to Rich Jolly, team.kingman-sta1@enron.com, team.kingman@enron.com and 13 more

    April Sample Run

    Here are the liquid amounts from this months sample run with PG&E. Please see attached spreadsheet.

  14. 18 Apr 2001

    Larry Campbell to David Roensch and 6 more

    Re: Nature Conservancy Meeting

    David, nice touch with the NC. I sure John will have some ideas on how to best to get this thing going after the NC gets back with you. Ill leave it up to Mr. Shafer as t…

  15. 17 Apr 2001

    David Roensch to Larry Campbell and 4 more

    Nature Conservancy Meeting

    Larry, per your request following our phone conversation today I'm forwading a brief note regarding our dinner meeting last night with the Arizona Chapter of the Nature C…

  16. 16 Apr 2001

    Kenny_Maltby@eott.com to buddy_binkley@eott.com, bob_jacobs@eott.com, Rich Jolly and 7 more

    FW: EOTT Gas Plant & Rogas Facility Kern County CA

    This came from the Kern County Tax Assessor, I thought it might be of interest.

  17. 6 Apr 2001

    Arnold Eisenstein to d.martin@enron.com and 32 more

    Red Rock Weekly Report

    1. ACTIVITIES: a. FERC Certificate is filed. No questions have been received to date. b Turbine Compressor Letter of Intent was issued to GE/NP for 4 PGT25+ for the Red R…

  18. 5 Apr 2001

    Mansoor Abdmoulaie to Lorraine Lindberg and 30 more

    TW-West Texas Expansion Level "A" release cost estimate 4/5/2001

    This is in response to your request of 3-26-2001 regarding the expansion of TW pipeline system in West Texas. Current Facility Capacity Summary Compression capacity at WT…

  19. 4 Apr 2001

    Larry Campbell to Rich Jolly and 28 more

    Re: DR/Pipe Cleaning on TW Mainline

    Rich, I agree with your concern. The entire Arizona mainline is a potential concern for carrying PCB's into California. We have verification of this from the last cleanin…

  20. 4 Apr 2001

    Eric Faucheaux to Lorraine Lindberg, Bob Burleson and 18 more

    EPFS Cost Estimate

    With reference to our meeting that we had on Monday morning (4/2) regarding competing suppliers for capacity on the Crawford Lateral (Duke and EPFS), Planning has determi…

  21. 27 Mar 2001

    Eric Faucheaux to Steven Harris, Jo Williams, Kevin Hyatt and 23 more

    P-2 Recycle & Cooling Issue

    Upon further review of previous recommendations to install recycle and cooling at CS P-2 to provide greater turndown, it has been determined that the P-2 turbine has too …

  22. 26 Mar 2001

    Eugene O'Gorman to Arnold L Eisenstein and 12 more

    RE: Nitrogen facility

    I quickly reviewed the Engelhard technology. It may have some nice applications. Here are the issues with this nitrogen rejection technology. Adaptation of PSA technology…

  23. 23 Mar 2001

    Donna Martens to Mary Kay Miller, Phil Lowry, Keith Petersen and 27 more

    Final Red Rock

    Attached is the final document with attachments for the Red Rock filing. Please let me know by 3 P.M. on Friday (3/23) if you have any comments or concerns. Also, please …

  24. 21 Mar 2001
  25. 15 Mar 2001

    Arnold Eisenstein to Jerry D. Martin and 30 more

    Red Rock Weekly Report

    1. ACTIVITIES: A. Discussions with TW on critical items in order to finalize FERC application: Navajo Environmental has requested a Threatened & Endangered Species (T&E) …