Enron email

Algorithmic Indexing

265 messages for to:ben.asante@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

to:ben.asante@enron.com means Ben Asante (ben.asante@enron.com).

  1. 23 May 2001

    Teresa Bosien to Steve Jernigan, Jeffrey E. Sommers, e..garcia@enron.com and 59 more

    EWS/Others Associate and Analyst Mid-year 2001 PRC - SAVE THE DATE

    SAVE THE DATE! The EWS/OTHERS Associate and Analyst Mid-year 2001 PRC will be held on June 25, 2001. This meeting will include representation from EWS, APACHI, CALME, COR…

  2. 16 May 2001

    David L. Johnson to Ben Asante, max@enron.com, Lloyd Will and 16 more

    TW - SJ Lateral MAOP Increase

    I have tried to summarize where I think we are at this time. Is anything else needed to move ahead in developing a recommendation for Phil? If so, please let the rest of …

  3. 15 May 2001

    Peter R. Stark to Max Brown, John Keller, Morgan Gottsponer and 13 more

    RE: Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River

    Max, As an alternative to replacing pipe can we consider applying Armour Plate wrap? Peter. Eur Ing Peter R. Stark CEng BSc, BA, MSc, MIM, SenMWeldI, MIMarE. MICorr. Tel:…

  4. 10 May 2001

    Ray Smith to Jerry D. Martin and 34 more

    Red Rock Weekly Report

    1. ACTIVITIES: a. Successful visit to Nuovo Pignone in Italy this week by a team consisting of representatives from E&C, GE and the engineering contractor, UEI. Most of t…

  5. 8 May 2001

    Omaha Helpdesk to adam.dushinske@enron.com, albert.hernandez@enron.com, Alice Johnson and 616 more

    Organization Announcement

    Organization Announcement from Steve Harris: Effective immediately, Kevin Hyatt, Director of the Transwestern Commercial Group, will be joining Eric Gadd of the Asset Dev…

  6. 8 May 2001

    Omaha Helpdesk to allen.cohrs@enron.com, andrea.woody@enron.com, andrew.williams@enron.com and 446 more

    Organization Announcement

    From the desk of Susan Neville I am very pleased to announce that effective May 16, Steve Thomas will transfer to Storage Services as Storage Capacity Manager reporting t…

  7. 7 May 2001

    Max Brown to John Keller, Morgan Gottsponer, Kevin Hyatt and 13 more

    Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River

    As I will be out of town at Gallup NM this week for the excavations planned for TW L-154 line, I will will miss the the meeting on the 10th. I have begun preparation of a…

  8. 1 May 2001

    Jeffery Fawcett to Kirk Ketcherside and 14 more

    Big Sandy Project pressure information

    Kirk, This is really dangerous... having a marketing guy talk to you about engineering matters. However, since we've recently worked with our other power plants to get th…

  9. 27 Apr 2001

    Gary Choquette to Gary Maestas, Kenneth Young and 12 more

    RE: SoCal Tour Update Meeting

    Attached are my planning/optimization notes from the SoCal meeting for the meeting.

  10. 22 Apr 2001

    Arnold Eisenstein to Jerry D. Martin and 32 more

    Red Rock Weekly Report

    1. ACTIVITIES: a. Video conference held with GE/NP to refine turbine SOW b. Marketing held a "bid" last week ending on Friday; results are encourging as multible bids wer…

  11. 19 Apr 2001

    David L. Johnson to Kevin Hyatt, Darrell Schoolcraft, John Keller and 12 more

    TW San Juan Lateral

    Thanks to all for a productive meeting. Here's the synopsis. Please let me know if I've missed anything. 1. Anticipated MAOP changes Bloomfield to Bisti - from 1200 to 12…

  12. 19 Apr 2001

    Stanley Horton to Phil Lowry and 12 more

    Re: TW Mainline Capacity & Station 8

    I agree. There have been way too many surprises from this group lately.

  13. 17 Apr 2001

    David L. Johnson to David L. Johnson, Steven Harris, Shelley Corman and 10 more

    San Juan Lateral MAOP Upgrade

    We have been asked to expedite a waiver request or whatever regulatory vehicle is appropriate to try to secure an MAOP increase on the TW San Juan Lateral. An initial mee…

  14. 6 Apr 2001

    Arnold Eisenstein to d.martin@enron.com and 32 more

    Red Rock Weekly Report

    1. ACTIVITIES: a. FERC Certificate is filed. No questions have been received to date. b Turbine Compressor Letter of Intent was issued to GE/NP for 4 PGT25+ for the Red R…

  15. 5 Apr 2001

    Mansoor Abdmoulaie to Lorraine Lindberg and 30 more

    TW-West Texas Expansion Level "A" release cost estimate 4/5/2001

    This is in response to your request of 3-26-2001 regarding the expansion of TW pipeline system in West Texas. Current Facility Capacity Summary Compression capacity at WT…

  16. 4 Apr 2001

    Larry Campbell to Rich Jolly and 28 more

    Re: DR/Pipe Cleaning on TW Mainline

    Rich, I agree with your concern. The entire Arizona mainline is a potential concern for carrying PCB's into California. We have verification of this from the last cleanin…

  17. 27 Mar 2001

    Eric Faucheaux to Steven Harris, Jo Williams, Kevin Hyatt and 23 more

    P-2 Recycle & Cooling Issue

    Upon further review of previous recommendations to install recycle and cooling at CS P-2 to provide greater turndown, it has been determined that the P-2 turbine has too …

  18. 15 Mar 2001

    Arnold Eisenstein to Jerry D. Martin and 30 more

    Red Rock Weekly Report

    1. ACTIVITIES: A. Discussions with TW on critical items in order to finalize FERC application: Navajo Environmental has requested a Threatened & Endangered Species (T&E) …

  19. 10 Mar 2001

    Arnold Eisenstein to Jerry D. Martin and 30 more

    Red Rock Weekly Report

    1. ACTIVITIES: a. Completed site visit to all stations and evaluation of existing facilities b. Discussions with TW on critical items in order to finalize FERC applicatio…

  20. 9 Mar 2001

    Elaine Concklin to Phil Lowry, Rick Craig, Don Hawkins and 40 more

    Upsides/Downsides

    Please see attached upside/downside list for ETS Operations. I have shown a sub-total for the items we will be including in our 1st Current Estimate per Phil's request. T…

  21. 8 Mar 2001

    Lorraine Lindberg to Perry Frazier and 18 more

    RE: EPFS interconnect

    I need as close to the exact cost for both 65,000 and 90,000 MMBtu/d as we can get. EPFS is going to pay for this and I don't want ETS to fund anything so it's important …

  22. 8 Mar 2001

    Perry Frazier to Lorraine Lindberg and 18 more

    RE: EPFS interconnect

    Let me know if you need a level A or level B, in my book a level B is a "good to go" estimate. The prior scope of 60 MMBtu/d was the max. the tap could handle, any thing …

  23. 7 Mar 2001

    Jeffery Fawcett to Ben Asante, Eric Faucheaux and 6 more

    Topock Lateral

    Gentlemen, In addition to looking for ways in which Transwestern can improve mainline deliverability, another important criteria is access to markets. With the addition o…

  24. 7 Mar 2001

    Lorraine Lindberg to Perry Frazier, Arnie Bailey and 16 more

    RE: EPFS interconnect

    I just got off the phone with El Paso Field Services. At this time, I now need 2 cost estimates. One to increase the facilities to be able to handle up to 65,000 MMBtu/d …

  25. 6 Mar 2001

    Mike McCracken to Kevin Hyatt, Michelle Lokay, Jeffery Fawcett and 34 more

    Marketing Roundtable Notes

    All Thank you very much for the great attendance and participation! Thanks, also, to all those who had to juggle this meeting with others. Attached are the notes from the…