from:zimin.lu@enron.com means Zimin Lu (zimin.lu@enron.com).
-
10 Jan 2002
Re: FW: Follow Up on Research Story
Ed McMichael and Mark Breese From gas structuring. Both are still around. -------------------------- Zimin Lu
-
8 Nov 2001
Zimin Lu to John Griffith, Larry May and 4 more
RE: OStrip Function
John, You are absolutely right. I have advised Tom Barkley to call Larry May before the new Ostrip was pushed out, making sure it would not affect his book. For some reas…
-
25 Oct 2001
Zimin Lu to Vince J Kaminski and 4 more
Research Support
Vince, Just let you know crack spread option trading is peaking up volumes. I will arrange a meeting for discussion of support. Zimin
-
23 Oct 2001
Zimin Lu to Vince J Kaminski and 2 more
SMS presentation
Vince, Our presentation at the SMS panel went very well. The audience asked quite a few questions. Mac from U Penn invited me for lunch and dinner tomorrow to talk about …
-
26 Sep 2001
Zimin Lu to John Griffith, Santiago Garcia, Ed McMichael Jr. and 3 more
Fixed strike lookback option
John & Santiago, Per our conversation, the lookback option you need is a fixed strike option. For put it pays max(K-min(S),0) The model in option library is for floating …
-
20 Sep 2001
RE: Bid-offer Algorithm
Vince, Thanks. Right now we will not do anything with him yet. Zimin
-
18 Sep 2001
Zimin Lu to Bob Lee and 2 more
Executive Summary of EOL Data Mining
Bob, I finished the draft of Summary to be included in "Statement of Work" document. I would like to finish all the paper work this week so that DA and DBA can start to s…
-
14 Sep 2001
Updated: Research Model for Power Prices-Zimin Lu Organizer
Zimin is the Meeting Organizer: "Power price modeling plays an important part in power option pricing, power plant valuation and outage insurance premium calculation. Ove…
-
20 Aug 2001
-
14 Aug 2001
-
18 May 2001
Zimin Lu to Christopher Jeska and 2 more
FW: FEA announces the release of @Energy 2.1.
Chris, FEA just released a new version of @Energy 2.1. Could you update it with the new version ? Hopefully it will not take you too much time. As always, I value your wo…
-
7 May 2001
1 factor HJM for the propane project
Stinson, Here is the 1 factor HJM model for curve simulation originally designed for a Coal Plant valuation. This techniques is useful for all kinds of curves, especially…
-
7 May 2001
1 factor HJM for the propane project
Stinson, Here is the 1 factor HJM model for curve simulation originally designed for a Coal Plant valuation. This techniques is useful for all kinds of curves, especially…
-
4 May 2001
Zimin Lu to John Griffith and 6 more
Re: Historical Volatility
John, You are correct, when you compute the historical volatility you need to use 252 days to annualize the volatility. This is because the historical data only existed f…
-
4 May 2001
Zimin Lu to Stinson Gibner, Bob Lee and 2 more
high frequency market data analysis
Stinson, We are going to update you and Vince the progress of the EOL George project. Friday, 9:30AM - 10:00AM in EB 1938. Bob, We may get some other ideas from the follo…
-
3 May 2001
Zimin Lu to John Griffith and 6 more
Re: Historical Volatility
John, You are correct, when you compute the historical volatility you need to use 252 days to annualize the volatility. This is because the historical data only existed f…
-
3 May 2001
Zimin Lu to Stinson Gibner, Bob Lee and 2 more
high frequency market data analysis
Stinson, We are going to update you and Vince the progress of the EOL George project. Friday, 9:30AM - 10:00AM in EB 1938. Bob, We may get some other ideas from the follo…
-
3 May 2001
Your advice is appreciated
Vince, In the morning we were talking about the El Paso candidate who thinks he is above something and is not willing to take certain project or responsibility. In real l…
-
2 May 2001
Re: Asian Option for Pavel
Our convention is whoever finalizes the model should write the documentation. It does not make sense to write one when changes are anticipated. You have been working on t…
-
2 May 2001
Your advice is appreciated
Vince, In the morning we were talking about the El Paso candidate who thinks he is above something and is not willing to take certain project or responsibility. In real l…
-
2 May 2001
Re: Asian Option for Pavel
Our convention is whoever finalizes the model should write the documentation. It does not make sense to write one when changes are anticipated. You have been working on t…
-
2 May 2001
Zimin Lu to tai.woo@enron.com, Paulo Issler
Re: Asian Option for Pavel
Tai Woo, Here are the c-codes for the CrudeAPO. 'Sig' is the spot volatility meaning the price volatility within the delivery period. You should consult with Pavel for th…
-
1 May 2001
Zimin Lu to Chonawee Supatgiat, Stinson Gibner, Vasant Shanbhogue and 5 more
PSIM model
Dear all, Following up with Vince's meeting on full requirement, we might just start with the existing Psim model. The attached spreadsheet is still running ! You need to…
-
1 May 2001
Zimin Lu to Lon Draper, John Disturnal and 6 more
Ostrip model extension
Lon, I added sensitivity of the ostrip premium to the basis offset (output 10) for the forward start options in OSTRIP2 model I added forward vega (7) gas daily vega (8) …
-
30 Apr 2001
Zimin Lu to Lon Draper, John Disturnal and 6 more
Ostrip model extension
Lon, I added sensitivity of the ostrip premium to the basis offset (output 10) for the forward start options in OSTRIP2 model I added forward vega (7) gas daily vega (8) …